CERAMIN - manual (EN)

Welcome to interactive presentation, created with Publuu. Enjoy the reading!

33

The subfloor must be clean, dry, dust-free,

load-bearing and even. The larger the tiles,

the less unevenness the floor should have.

All tests of the subfloor must be carried out

first (see page 20).

If necessary, the floor should be levelled

using a self-levelling floor levelling com-

pound. Pay attention to the specified maxi-

mum layer thickness and drying times.

Aft erwards, the processing and gluing is

done as described in the previous chapter.

If door frames need to be shortened, they

are “undercut” with a handsaw, an assem-

bly router or a multitool.

TIP: When undercutting the door frame,

guide the cutting tool “on the material” that

will later be installed in the room. Use a lef o-

ver piece for this purpose. This way the cut is

made at exactly the right height.

TIP: With a cross-line laser you can easily

and absolutely accurately measure all floor

and wall surfaces and check horizontal and

vertical flatness.

INSTALLATION ON THE FLOOR

Made with Publuu - flipbook maker